by MisterAdminSir | Feb 9, 2015
Energy Inspection and Energy Recovery Wheel Installation Pakanasink Elementary School, Pine Bush, NY OverviewCircleville Middle School needed to upgrade its natatorium air conditioning system. MEP was subcontracted to conduct inspections and upgrade the energy...
by MisterAdminSir | Feb 9, 2015
Ventilation & Boiler Installation: Energy Performance Assessment and Mechanical Design Pine Bush Central School District, Administration Building, Pine Bush, NY OverviewThe Pine Bush School Administrative building required energy performance assessment targeted at...
by MisterAdminSir | Feb 9, 2015
Unit Vents, School Exhaust, Pool Boiler and Air Handling Unit: Code Compliance Assessment and Mechanical Design Pine Bush High School, Pine Bush, NY OverviewPine Bush High School needed to analyze its HVAC system to ensure that they met code compliance. MEP was...
by MisterAdminSir | Feb 7, 2015
HVAC Evaluation Study and Recommendations Circleville Middle School and Pakanasink Elementary, Pine Bush NY OverviewBoth Circleville Middle and Pakanasink Elementary Schools had severe issues with their heating and ventilation systems. Though they had two major system...
by MisterAdminSir | Feb 7, 2015
Modular Boiler & Domestic Hot Water Heater Upgrade: System Analysis and Design Country Club Gardens, West Babylon, NY OverviewThis 25-year-old residential building complex had issues meeting heating demands in winter, had fuel costs that were 30% higher than...
Recent Comments